calmedfoundation.org
calmedfoundation.org / Research and analysis /

In order to avoid this problem, the company had to suspend production over the weekends and replace worn-out tools or oc


In order to avoid this problem, the company had to suspend production over the weekends and replace worn-out tools or oc
In order to avoid this problem, the company had to suspend production over the weekends and replace worn-out tools or occasionally use overtime to get back on schedule.
The key point to note from this application is that a simulation model could be used to analyze a highly complex system for a number of what-if scenarios and to gain a better understanding of the dynamics of the system.
The problem is modeled by a very large mixed-integer linear program - a typical formulation could result in about 60,000 variables and 40,000 constraints.
The planning horizon for each problem is one day since the assumption is made that the same schedule is repeated each day exceptions such as weekend schedules are handled separately .
The primary objective of the problem is to minimize the sum of operating costs including such things as crew cost, fuel cost and landing fees and costs from lost passenger revenues.
The bulk of the constraints are structural in nature and result from modeling the conservation of flow of aircraft from the different fleets to different locations around the system at different scheduled arrival and departure times.Fassilia
United States. Alabama



day: 19.09.2018
views - 913


photo:

In order to avoid this problem, the company had to suspend production over the weekends and replace worn-out tools or oc

It was also determined that minimizing the makespan which is the time required to produce all daily requirements would b
It was also determined that minimizing the makespan which is the time required to produce all daily requirements would be the best objective since this would also maximize as well as balance machine utilization.
A detailed simulation model was then constructed using a specialized language called SLAM.
In addition to the process plans required to specify the actual machining of the various part types, this model also accounted for a number of factors such as material handling, tool handling and fixturing.
Several alternatives were then simulated to observe how the system would perform and it was determined that a fairly simple set of heuristic scheduling rules could yield near optimal schedules for which the machine utilizations were almost 85 .
However, what was more interesting was that this study also showed that the stability of the schedule was strongly dependent on the efficiency with which the cutting tools used by the machines could be managed.
In fact, as tool quality starts to deteriorate the system starts to get more and more unstable and the schedule starts to fall behind due dates.Fassilia
United States. Alabama



day: 19.09.2018
views - 910


photo:

In order to avoid this problem, the company had to suspend production over the weekends and replace worn-out tools or oc

StarBlend is an extension of OMEGA to a multi-period planning environment where optimal decisions could be made over a l
StarBlend is an extension of OMEGA to a multi-period planning environment where optimal decisions could be made over a longer planning horizon as opposed to a single period.
In addition to blend quality constraints, the optimization model also incorporates inventory and material balance constraints for each period in the planning horizon.
The optimizer uses an algebraic modeling language called GAMS and a nonlinear solver called MINOS, along with a relational database system for managing data.
The whole system resides within a user-friendly interface and in addition to immediate blend planning it can also be used to analyze various what-if scenarios for the future and for long-term planning.
At Caterpillar, a preliminary analysis showed that the FMS was being underutilized and the objective of the project was to define a good production schedule that would improve utilization and free up more time to produce additional parts.
In the orientation phase it was determined that the environment was much too complex to represent it accurately through a mathematical model, and therefore simulation was selected as an alternative modeling approach.Fassilia
United States. Alabama



day: 19.09.2018
views - 769


photo:



It works by breaking up the overall problem into smaller, more manageable problems by using a heuristic decomposition ap
It works by breaking up the overall problem into smaller, more manageable problems by using a heuristic decomposition approach.
Mathematical models within the problem are solved using linear programming along with concepts from material requirements planning.
The entire system interfaces with sophisticated databases allowing for forecasting, quotation and order entry, materials and dynamic information on capacities.
Harris estimates that this system has increased on-time deliveries from 75 to 95 with no increase in inventories, helped it move from 75 million in losses to 40 million in profits annually, and allowed it to plan its capital investments more efficiently.
As an initial response to this complex problem, in the early to mid 1980 s Texaco developed a system called OMEGA.
At the heart of this was a nonlinear optimization model which supported an interactive decision support system for optimally blending gasoline; this system alone was estimated to have saved Texaco about 30 million annually.Fassilia
United States. Alabama



day: 19.09.2018
views - 621


photo:



The bottom line is that an O.
The bottom line is that an O.
project can be successful only if sufficient attention is paid to each of the seven steps of the process and the results are communicated to the end-users in an understandable form.
Some examples of successful O.
projects are now presented.
In the orientation phase it was determined that the MRP type systems used by a number of its competitors would not be a satisfactory answer and a decision was made to develop a planning system that would meet Harris unique needs - the final result was IMPReSS, an automated production planning and delivery quotation system for the entire production network.
The system is an impressive combination of heuristics as well as optimization-based techniques.Fassilia
United States. Alabama



day: 19.09.2018
views - 487


photo:



more ads:

In addition there are constraints governing the assignment of specific fleets to specific legs in the flight schedule.
In addition there are constraints governing the assignment of specific fleets to specific legs in th ...

However, it is critical to maintain a problem-driven focus - the ultimate aim of an O.
However, it is critical to maintain a problem-driven focus - the ultimate aim of an O.
study is t ...

On the other hand, there is also evidence to suggest that unfortunately the criticisms leveled against O.
On the other hand, there is also evidence to suggest that unfortunately the criticisms leveled again ...

In this section some examples of successful real-world applications of operations research are provided.
In this section some examples of successful real-world applications of operations research are provi ...

Since the validity of the solution obtained is bounded by the model s accuracy, a natural question that is of interest t
Since the validity of the solution obtained is bounded by the model s accuracy, a natural question t ...

Some examples of popular O.
Some examples of popular O.
software systems include CPLEX, LINDO, OSL, MPL, SAS, and SIMAN, to n ...

In this context, it is often more important to quickly obtain a solution that is satisfactory as opposed to expending a
In this context, it is often more important to quickly obtain a solution that is satisfactory as opp ...

Although heuristics could be simple, common-sense, rule-of-thumb type techniques, they are typically methods that exploi
Although heuristics could be simple, common-sense, rule-of-thumb type techniques, they are typically ...

First, there are simulation techniques, which obviously are used to analyze simulation models.
First, there are simulation techniques, which obviously are used to analyze simulation models.
A ...

Maximize Profit 10G 9W , subject to 0.
Maximize Profit 10G 9W , subject to 0.
25W 135 G, W 0 and integers.
This mathematical program ...

ads

ads